Project Summary #99-6024:
Waterdown Montessori School, Waterdown, Ontario.
Client Need:
The client required a custom school complex on an existing site.
Building Size:
5,200 square feet.
Time to Complete:
From start of production to completion on site, 12 weeks.
Project Outline:

This custom school complex was built using a steel floor/wood frame structure. One feature of note was an 18 foot high multi-purpose room shown at the left. Another requirement was an exterior look that would complement the existing school on the same site, which NRB created through a stucco exterior with sliced stone embellishments.

The site was tight, and to ensure a perfect solution, NRB provided all site services and foundations in addition to the building.

Download the project summary
(PDF 251 Kb)

 

Photo 2
Home Site Map

 Project Summaries

 Educational
    Bayview Hill Elementary      School, Permanent
     Classroom

    Westland Middle School
     Permanent Modular Addition

    Millmont School, Permanent
     Modular School

    ABCD Inc., Permanent
     Daycare Facility

    Thomas Ford Elementary,
     Permanent Modular School

    Charter School, Four Storey
     Modular School

    Halton Board of Education,
     Permanent Modular Addition

    Jarvis Public School,
     Permanent Modular School
     Addition

    Private School, Permanent
     Modular Addition

    Waterdown Montessori,
     Custom School Complex

 Institutional
   Queen Anne's County      Detention Center  
   Somerset County Detention      Center    
   Homeless and Transient
    Housing

    Back to Building Lines
    Request Information CD
    Download our Brochure


 

Contact NRB
Case Studies The NRB Total Building Experience spacer  
Privacy Policy        © 2007 NRB Inc