Project Summary #2065010:
Thomas Ford Elementary School, Reading, Pennsylvania.
Client Need:
The client had experienced rapid growth for many years, temporarily solving the situation in 1997 with a number of standard portable classrooms. In 1998, these were replaced with a temporary multi-classroom complex.
Building Size:
24,000 square feet.
Time to Complete:
5 months.
Project Outline:

NRB worked closely with the owner’s Architect and General Contractor to produce the 48 prefabricated modules and related components for this 24,000 sq.ft. concrete and steel school facility.

In order to streamline the on site completion of the building, NRB completed all structural elements including the raised clear span clerestory roof over the multipurpose room, curved barrel vault roofs over all of the entrances and exterior concrete decks. As well, NRB completed and commissioned all interior finishes including millwork, fitments, folding partitions, final painting as well as mechanical, electrical, plumbing and fire protection systems. The General Contractor completed all foundations, exterior building cladding and site work. This division of responsibilities was key to achieving the owner's specified occupancy date.

Building features include custom interior colours throughout providing a bright friendly facility for the students and staff. The multipurpose room includes a 14 foot clear ceiling height with exposed spiral ductwork, trusses and acoustical roof deck as well as acoustical panels.

The multipurpose room roof was raised above the surrounding modules to allow for natural light along both sides.

Sound rated folding partitions in large classrooms were provided to allow for adjustments and variety in classroom sizes.

Energy saving materials such as insulated fibreglass windows, motion activated lighting controls, high efficiency HVAC units and programmable thermostats were installed.

Download the project summary
(PDF 0.5 Mb)

 

Photo 2
Home Site Map

 Project Summaries

 Educational
    Bayview Hill Elementary      School, Permanent
     Classroom

    Westland Middle School
     Permanent Modular Addition

    Millmont School, Permanent
     Modular School

    ABCD Inc., Permanent
     Daycare Facility

    Thomas Ford Elementary,
     Permanent Modular School

    Charter School, Four Storey
     Modular School

    Halton Board of Education,
     Permanent Modular Addition

    Jarvis Public School,
     Permanent Modular School
     Addition

    Private School, Permanent
     Modular Addition

    Waterdown Montessori,
     Custom School Complex

 Institutional
   Queen Anne's County      Detention Center  
   Somerset County Detention      Center    
   Homeless and Transient
    Housing

    Back to Building Lines
    Request Information CD
    Download our Brochure


 

Contact NRB
Case Studies The NRB Total Building Experience spacer  
Privacy Policy        © 2007 NRB Inc