No Limits....Only Possibilities NRB Logo


Click any image for larger view.

Project Summaries
Equipment & Storage

Project Summary #982027:
Equipment Shelter, Union Gas, Ancaster, Ontario
Client Need:

The client and related companies required numerous exterior boiler and equipment enclosures.

Building Size:
270 square feet, with a 12' height.
Time to Complete:
From start of production to completion on site, 5 weeks.
Project Outline:

NRB has manufactured a number of similar enclosures for this client and their related partners.

This pre-engineered steel building has an inside height of 12'. A structural steel floor assembly supports the equipment inside. The wall and roof assembly is fully insulated. This particular project, for the Ancaster Transmission Station, was built at the NRB plant, delivered to the site in one piece and craned into position.

Download the project summary
(PDF 0.2 Mb)

Photo 2
Home Site Map

 Project Summaries
    Hazardous Materials Storage     Warehouse
    Equipment Shelter

    Back to Building Lines
    Request Information CD

 

Contact NRB
Case Studies The NRB Total Building Experience spacer  
Privacy Policy        © 2007 NRB Inc