Project Summary #965002:
Office and Record Storage Vault, Ontario Hydro, Pickering, Ontario
Client Need:

The client had an immediate need for a two storey standalone building, with the added requirement of a mandatory occupancy date within 9 weeks.

Building Size:
14,500 square feet, using two storeys and in 28 modules
Time to Complete:
From start of production to completion on site, 8 weeks.
Project Outline:

In mid-October 1995, NRB was challenged to manufacture and deliver a 14,500 square foot two storey steel and concrete modular building, to an Ontario Hydro site with occupancy of the record vault area a mandatory requirement by December 31.

On December 4, within six weeks of project start, NRB began shipping the 13' x 40' building modules (28 in total) to the site for installation.

And on December 15, Hydro began transferring their documents from storage facilities off site into the secure vault. Hydro uses the building as a records management control centre, housing all records management personnel.

The sprinklered vault area protects critical files and documents, and features a pre-poured concrete floor and ceiling assembly with two-hour fire rating throughout. A unique feature of this modular building is its hydraulic elevator. The elevator shaft was structurally designed and prefabricated in the upper and lower modules before being site installed.

This office/storage facility includes complete electrical, HVAC and plumbing systems, mostly preinstalled at the NRB plant. The exterior finish is 24-gauge steel cladding, and the interior is vinyl-covered gypsum board, with carpet and tile floor finish. The ceiling height on each floor is 8 feet 6 inches, finished with suspended acoustical tile.

This building office won an Honourable Mention in the 1996 building competition of the Modular Building Institute. MBI is an association of U.S., Canadian and other international modular builders and suppliers.

Download the project summary
(PDF 0.2 Mb)

Photo 2
Home Site Map

 Project Summaries
    Traffic Operations Centre
    Permanent Modular Office
   
Building
    Temporary Office Addition
    Office and Record Storage
    Vault

    Office Complexes

    Back to Building Lines
    Request Information CD
    Download our Brochure

 

Contact NRB
Case Studies The NRB Total Building Experience spacer  
Privacy Policy        © 2007 NRB Inc