Project Summaries
Medical/Health Care
| Project
Summary #N15041: |
| MRI
Imaging Clinic Hospital Addition, Innova Fair Oaks Hospital,
Fairfax, Virginia. |
| Client
Need: |
| This
extremely busy hospital had an immediate need for an addition,
in part to house an MRI clinic, but could not accommodate
or tolerate the huge disruption that would have been caused
by site construction.
|
| Building
Size: |
| 1,586 square
feet.
|
| Time
to Complete: |
| From start of production to shipment to site, 6 weeks. |
| Project
Outline: |
|
This entire addition was built in
the NRB plant, using steel framed post and beam construction.
Additionally, the integrated concrete flour was pre-poured
at the plant, and mechanicals and electricals were added
as well. The three modules were then shipped and quickly
assembled at the site. On this project, the brick exterior
was completed at the site in order to perfectly match
the façade of the existing hospital.
|
Download
the project summary
(PDF 0.32 Mb)
|
|
Project Summaries
Free-Standing
Permanent
Imaging Clinic
Hospital
Addition
MRI Imaging Clinic
Imaging/CT Scan
Clinic
Two Storey Emergency
Room
Hospital Addition