Permanent Constructed Laboratory - U.S. Environmental Protection Agency Laboratory

U.S. Environmental Protection Agency Laboratory

Project Overview

Project: U.S. Environmental Protection Agency Laboratory

Location: Edison, NJ

Building Size: 6,969 sq. ft.

Start Date: April 2010

Completion Date: November 2010

Project Summary

The U.S. Environmental Protection Agency needed a permanent constructed laboratory that could be moved at a later date and reassembled. NRB’s off-site construction technology using structural steel and pre-poured concrete floors and “Build-Together” process provided the perfect solution. The units arrived on site fully equipped with all millwork and electrical/mechanical systems and fume hoods with acid venting assemblies installed. The laboratory had to meet stringent requirements; indoor air quality was of paramount concern.

NRB incorporated a complex design of HVAC systems along with rigid type insulation systems for the building envelope to provide an air tight barrier from external air contaminate infiltration. Individual DDC systems were installed to manage the air quality of each area.

pdf Environmental Protection Agency Laboratory Project Profile (PDF)