

Project: Waterdown Montessori School
Location: Waterdown, ON
Building Size: 5,200 sq. ft.
Start Date: April 2000
Completion Date: July 2000
A custom modular school complex was required by a client for an existing site. To ensure the perfect solution to a site that was restricted in size, all site services and foundations, in addition to the building, were provided by NRB.
The school complex was built using a steel floor and wood frame, and features an 18-foot high multi-purpose room. As well a stucco exterior with sliced stone embellishments was created by NRB in order to complement the existing school.



For More Information Please Contact: