Project: Union Gas Boiler and Equipment Enclosures

Location: Ancaster, ON

Building Size: 270 sq. ft.

Start Date: October 1998

Completion Date: November 1998

Project Summary

NRB has built numerous exterior boiler and equipment enclosures for Union Gas and their related partners.

This particular example, for the Ancaster Transmission Station, was manufactured at the NRB plant and delivered to the site in one piece, then craned into position. Featuring fully insulated walls and roof, this equipment shelter was built with a structural steel floor assembly to support the equipment inside.

 